228m2 Pre-engineered Steel Framed Home

For development projects of no less than 24-units

Price does not reflect shipping, technician fees, local labor, building permits, custom/import duties, foundation, property infrastructure work, a complete list of exclusions will be provided.

For complete details please inquire by e-mail: mail@edihousing.com

  Special Offer for Limited Time, 228m2 two-story Steel Framed Homes

 

Total area 228m2 (w/o garage 156m2)

 

1st floor 70m2

Dimensions 42’x43’

2nd floor 70m2

Front porch 16m2

Optional garage 44m2

Unfinished area above garage 28m2

3-bdr

Formal living room

2-full bath, 1-half bath

 

Estimated price w/o garage

$88,900.00

Estimated price w/garage and unfinished room above

$99,500.00

Min order

24-units

 

House Material List Details:

1. Exterior and interior walls: steel structures within 50mm glass wool in stud

2. Cladding: fiber cement board (12mm)

3. Roof: plywood plus Owens-Corning’s tile

4. Foundation: slab for common area (provided by developer)

5. Flooring: wooden flooring for first floor, steel deck plate plus concrete and wooden flooring for second floor;( developer to provide concrete)

6. Metallic doors for the exterior (with handles, hinges, locks included)

7. Wooden doors for the exterior (with handles, hinges, locks included)

8. Windows: PVC windows or ALU windows (double glazing glass included) (EDI supplies the design)

9. Thermal insulation: glass wool

10. Ceiling: PVC panels covering the kitchen, bathroom and laundry’s ceiling; drywall covering the other ceiling areas in the house.

11. Party wall for bathroom, laundry and kitchen: steel frame plus drywall

INTERIOR PLUMBING

1. One stainless steel sink with plumbing on a low cupboard – made in china

2. Three porcelain washbasin on stand with warm and cold plumbing- made in china

3. Three porcelain dual-flush WC with plastic seat-made in china

4. Two porcelain bath with the shower system in the wall, with warm and cold plumbing-made in china

5. Copper for water in, 12mm copper T: 0.7MM

6. Waste and Vent Lines PVC pipe

INTERIOR ELECTRICITY

1. Pre-punched the electrical hole in the steel stud (Developer supplies the electrical drawing)

2. Installation according to local building standards based on developer supplied drawings

3. All the electric wires under PVC tubes-made in china

4. Local standards electric outlets (EDI to help developer to source them)

INCLUDED IN OFFER

1. Plans with your own modifications

2. Building of the houses by our technicians assisted by local manpower paid by the customer

DELIVERY:

  1. The 24 houses will be out of the factory 40 days after signing the contract and after the first payment received.
  2. The speed of completion to be determined by developer, estimates for 24-units with ample crews 45-120 days.
  3. Each unit requires two 40ft containers.
 

Copyright © K.I.S.S. Management Ltd. - Created with ThunderSite